Legionella Log Book: What to Record and How Long to Keep It

How many sites?

Your quote by email within one working day · No obligation

Used only for this enquiry. No marketing lists. Privacy notice

The log book is the record that your written scheme is being followed. HSE guidance says records must include five things. Who is responsible, the significant findings of the risk assessment, and the written scheme with how it is carried out. Then whether each system is in use, and the result and date of every check. Keep the assessment and the scheme for two years after they are replaced. Keep the results of checks for five years.

An inspector asks for the log book before anything else, because it shows what actually happened. Below: what to record for each check, and how to write an entry that stands up. Then the mistakes that turn a full log book into evidence against you.

No assessment yet, so nothing to log against? A fixed price within one working day.

What a legionella log book is

Your risk assessment says where legionella could grow in your water system. Your written scheme says what will be done about it, and how often. The log book is the third document: the record of those things being done.

It can be a ring binder in the plant room, a spreadsheet, or a system on a phone. The HSE does not say which. What matters is that the record exists, that it can be produced when asked for, and that it shows who did what, where and when.

Most sites keep the three together: the assessment at the front, the scheme behind it, and the log sheets behind that. Then anyone who picks the binder up can see what the site should be doing and whether it is.

What the written scheme contains

The five things HSE guidance says records must include

ACOP L8, the HSE's Approved Code of Practice, lists what the records should cover. There are five items:

  1. Who is responsible. The person appointed to carry out the risk assessment, and the person who manages and carries out the written scheme. Often the same person; name them, and their deputy.
  2. The significant findings of the risk assessment. The assessment itself, or its summary, with its review date.
  3. The written scheme, and how it is being carried out. The scheme, and the evidence that its checks happen: the log sheets.
  4. The state of each system. Whether each system, and each part of it, is in use or out of use. An outlet taken out of service is still part of the record until it is removed.
  5. The result and date of every check. Every monitoring inspection, test or check, with what was found and when.

If you have five or more employees you must keep these records. With fewer than five there is no duty to write anything down, but the HSE says a written record is still useful. It is also the only way to show, later, that the checks were done.

Who the duty holder and the responsible person are

What to record, check by check

Your written scheme sets the checks for your site. For a hot and cold water system, HSG274 Part 2 gives the usual ones and how often. For each, this is what the entry needs.

  • Monthly hot water temperatures at sentinel outlets. The outlet, the reading, and that it reached 50°C within a minute of running. Sentinel outlets are the nearest and furthest from the cylinder, so the same outlets every month.
  • Monthly cold water temperatures at sentinel outlets. The outlet, the reading, and that it was below 20°C within two minutes of running.
  • Monthly cylinder temperatures. The flow from the hot water cylinder, at or above 60°C, and the return, not below 50°C, for a circulating system.
  • Weekly flushing of little-used outlets. The outlet, the date, and who ran it. A gap in this sheet is as telling as an entry.
  • Quarterly shower heads and hoses. Dismantled, cleaned and descaled, or more often where they foul quickly. The date, the location and who did it.
  • Six-monthly cold water tank temperatures, and the annual tank inspection. The stored water and the incoming mains in summer. Once a year, the condition of the tank, the lid and the insect screen, and what was done about any debris.
  • The annual cylinder inspection. The inspection of the hot water cylinder, or the purge of its base where there is no hatch, with the date and the findings.
  • Thermostatic mixing valves. The service and the fail-safe test, at the interval the scheme sets, valve by valve.
  • Water samples. The outlet, the date, the laboratory, the result, and what was done if it was positive. Keep the laboratory certificate with the entry.
  • Remedial work. Every failed reading or adverse finding, what was done about it, by whom, when, and the reading that showed it worked.

The temperatures themselves, and why those numbers, are in the temperatures guide. How to flush, and for how long, is in the flushing guide.

Legionella temperatures: what the numbers mean

Flushing little-used taps and showers

How to write an entry that stands up

HSE guidance asks for every check to be recorded with who did it, the date, and exactly where. The point is repeatability: next month, the same check can be done in the same place and the two readings mean something side by side.

A good entry has six parts:

  1. The date. And the time, where the scheme asks for a reading after a set period of running.
  2. Exactly where. Not "first floor tap" but "Room 12 en-suite basin, hot". Give each outlet a reference on the schematic and use it every time.
  3. The reading or the finding. The number, in degrees, or what was seen. Never just a tick.
  4. Pass or fail. Against the figure in the written scheme, so a reader does not have to look it up.
  5. What was done. For a fail, the action taken or who it was passed to. For a pass, nothing more is needed.
  6. Who did it. Initials are enough if the log book says whose they are.

Write the entry when the check is done, not at the end of the week from memory. If a check is missed, leave the line blank and say why. A missed check recorded honestly is a gap in the scheme. A line filled in later is a false record.

How long to keep legionella records

ACOP L8 sets two periods, and HSG274 Part 2 repeats them:

  • The risk assessment and the written scheme: for as long as they are current, and for at least two years after they are replaced.
  • The results of monitoring, inspections, tests and checks: for at least five years.

So the log sheets from five years ago still need to be findable, even if the responsible person has changed twice since. When a binder fills up, box the old sheets by year and keep them with the current one.

HSG274 Part 2 adds three things it may be helpful to keep as well. Staff training records, and the reports of outside contractors such as water treatment companies. And information on other hazards, such as the safety data sheets for any chemicals used.

Healthcare premises in England follow HTM 04-01 as well as HSG274, and it has its own expectations for records. If you run a hospital, a clinic or a GP practice, check it alongside this guide.

Three ways a log book stops being evidence

A full log book is not the same as a good one. These three faults turn up again and again, and each one makes the record work against the site.

  1. Gaps. Three months of a monthly check missing does not read as "nobody got round to it". It reads as the scheme not being followed, in writing.
  2. Readings the system could not produce. A hot outlet logged at 55°C every month for two years, to the degree, on a system with a failing cylinder. Back-filled records have a pattern, and an experienced reader sees it quickly.
  3. A fail with nothing after it. A cold tap logged above 20°C three months running, with no action recorded. Every other entry can be perfect and the log book still shows the scheme is not being used.

An honest, incomplete record can be put right from today. A record that has clearly been made up cannot.

What to do when a reading fails

Who keeps the log book

The responsible person. They may not do every check themselves. They make sure the checks happen, look at the entries, act on the fails, and sign the sheets off. Their deputy does the same when they are away.

The people doing the checks need to know what they are measuring and why. Then a strange reading is noticed rather than written down and forgotten. A short awareness course covers it, and the training record goes in the log book too.

Many sites have the monthly round done for them, with the log book kept and the fails flagged. That is a service we quote for, priced on the number of outlets and systems. The duty to keep the record stays with you either way.

Legionella awareness training

Monitoring and log books, done for you

Starting a log book from nothing

If there is no log book, start today. Do not try to recreate the past. Begin with the risk assessment and the written scheme, because they say what the log book should contain for your site. Without them the log book has nothing to be checked against.

A risk assessment from us comes with a schematic of the system, the sentinel outlets named, and the checks your scheme needs. The log sheets can be ruled up the same week. Your fixed price arrives by email within one working day.

Get my price

City & Guilds qualified, LCA registered assessors · Report usually within 10 to 15 working days of the visit

Questions

Questions people ask

How long do you have to keep legionella records?

Two periods. The risk assessment and the written scheme: while they are current and for at least two years after they are replaced. The results of monitoring, inspections, tests and checks: at least five years. Both come from ACOP L8.

Get my price

Can the legionella log book be electronic?

Yes. HSE guidance does not say paper or electronic. The record has to exist, show who did what, where and when, and be produced when asked for. A spreadsheet or an app does that as well as a binder, as long as old entries cannot be quietly changed.

Monitoring and log books

Who should fill in the legionella log book?

Whoever does the check records it, at the time. The responsible person reads the entries, acts on any fail and signs the sheets off. Name both in the front of the log book, with their deputies.

Legionella awareness training

What if a monthly check was missed?

Leave the line blank, write why, and do the check now. Never fill the line in afterwards. One honest gap is a scheme to tighten; a back-filled entry is a false record.

Get my price

Does a log book replace the written scheme?

No. The written scheme says what will be done and how often; the log book shows it being done. You need both, and the risk assessment they come from.

Written scheme of control

Does a small office with a combi boiler need a log book?

It needs a risk assessment first. If that finds the HSE's low-risk case, the checks may be few and the log book a page a year. The assessment decides, and the record shows the decision was made.

Do I need one? Three questions

What does an inspector ask to see?

The risk assessment, the written scheme and the log book, usually in that order. Then they read the log book for gaps, for readings out of range, and for what was done about them.

Get my price

Your fixed price. Six questions from here.

About 2 minutes · No account · No obligation

Carried out by our City & Guilds qualified, LCA registered risk assessors.

Who are the LCA?

The Legionella Control Association (LCA) is a UK body for companies that provide legionella control services. It was founded in 1999 by the Water Management Society and the British Association for Chemical Specialities (now the BCA). Member companies are audited when they join and every year after that. The audit is against the LCA Code of Conduct and its Service Standards, and covers only the services they have registered. A company is only listed while it appears on the LCA directory.

Your assessment is carried out by our City & Guilds qualified, LCA registered risk assessors. The registration is shown on your quotation, and you can check it on the LCA directory.

Registration shows a company works to an audited standard. It is not a guarantee, and the LCA does not assess individual staff, so we also show you exactly what is included and what happens on the day.

Read more